Marathon Center · Progress
PROGRESS
Recent months have been busy!
Here’s where we are with the IMC…
The Foundation has signed a 99-year lease with the town of Hopkinton for a 19-acre site on Route 135 – on the Boston Marathon course, less than a mile from the starting line – on which to develop the IMC. News of the lease was announced by the town in May of last year.
We have contracted with ConsultEcon, https://www.consultecon.com, of Cambridge, MA, who validated the 26.2 Foundation’s vision and plan by formulating a vigorous economic-impact analysis.
We are working with GRL Architects, https://www.grlarchitects.com, of Hopkinton, MA, drawing up plans for the state-of-the-art, 25,000-square-foot facility that will include a world-class museum and hall of fame, 11,000 square feet of dedicated exhibit space, an auditorium, library, and conference and educational space.
We have collaborated with HealyKohler Design of Washington, D.C., http://www.healykohler.com , to design a world-class, interactive visitor experience, intended to maximize repeat visitation and sustainability.
We are completing site due-diligence and permitting, with the work being led by the Southborough, MA-based engineering firm, Beals + Thomas, https://www.bealsandthomas.com.